Facebook

Like/follow

Like us on Facebook and follow us on Twitter

Twitter

Sunday 15 September 2013

A welcomed rain storm


 On Saturday the 14th of September, the guttering on the pavilion was finally finished after many years of being incomplete. To finish the job, the guttering from the lean-to was joined to the guttering from the side of the pavilion, this was then plumed into an old container which will hold the water till needed. This will also be fitted with a pump so that water can be pumped out or so that it can come out of the tap to fill buckets or watering cans. There will also be an overflow fitted to this storage so that excess water can be deposited into the soak away. So all we need now is the rain, one thing that we are never short of in Britain.


No comments:

Post a Comment